Effective April 1, 2009, NPPD became a member of the Southwest Power Pool Regional Transmission Organization (RTO). As such, NPPD's Generator Interconnection Queue has moved under the SPP RTO and the SPP Regional Tariff. SPP manages all Generator Interconnection requests within the SPP Member Footprint. SPP Generator Interconnection Policies and Procedures are located at the following link: http://www.spp.org/section.asp?pageID=95.