Retail Energy Analysis
| Energy Audit Checklist | |
| Lighting – Operation | |
| Use automated lighting controls. | |
| Utilize photocells for all-night outdoor lighting. | |
| Use timers in parking lots and restricted-access areas. | |
| Utilize dimming controls to take advantage of daylighting. | |
| Use motion sensors for low-traffic areas. | |
| Always de-energize ballasts that are not in use. | |
| Reduce lighting to minimum acceptable level for safety/security in: hallways, restrooms, storeroom and coolers. | |
|
Recommended Lighting Levels for Retail Stores
|
||
|
Store Area
|
Average Footcandles
|
|
| High value/intricate merchandise |
100
|
|
| Fitting rooms |
75
|
|
| Cosmetics/pharmacy |
75
|
|
| General merchandise |
50
|
|
| Offices |
45
|
|
| Stockrooms |
30
|
|
| Lounges |
20
|
|
| Lighting – Maintenance | |
| Clean lamps and fixtures for maximum illumination. | |
| Repair/replace broken fixtures. | |
| Replace non-working lamps with the lowest wattage available while maintaining lumen output. | |
| Develop and implement a lamp upgrade program to energy efficient lighting (T-8, compact fluorescent, etc.). | |
| Add reflectors to existing lighting. | |
| Label panels and switches so lighting can be monitored and controls can be accessed. | |
| Lighting – Procedures | |
| Turn off lights not being used. | |
| Use task lighting in place of area lighting where possible. | |
| Open drapes/blinds and use natural lighting when possible. | |
| Designate and light only specific parking areas for use. | |
| Use decorative lighting and electrical signs only during high-traffic hours. | |
| Heating, Ventilation and Air Conditioning (HVAC) – Maintenance | |
| Replace furnace filters on a montly or bi-monthly schedule. | |
| Allow free airflow to and from registers. | |
| Insulate hot water heater(s) and pipes, and ductwork located in unconditioned areas. | |
| Cover and lock thermostats and ventilation controls to prevent unauthorized adjustments. | |
| Check for unusual noise, vibration and decrease in performance or compressors/motors. | |
| Seal ductwork leaks. | |
| Inspect/clean condenser coils. | |
| Clean and disinfect condensate drain pans. | |
| Set up monthly/bi-monthly maintenance contract. | |
| Heating, Ventilation and Air Conditioning (HVAC) – Procedures | |
| Minimize heating and cooling in unoccupied, low-traffic areas or when building is not in use. | |
| Adjust building temperature by season; lower in winter and higher in summer. | |
| Utilize ceiling fans whenever possible. | |
| Close doors to outside and unheated or uncooled areas. | |
| Use exhaust ventilation only when required. | |
| If fossil fuels are present, test operation of carbon monoxide (CO) detectors monthly. | |
| Building Envelope | |
| Check and verify insulation levels. | |
| Fill in outside air leaks with a low expanding foam. | |
| Replace cracked or missing window and door caulking. | |
| Install solar film or blinds for windows with east, west or south exposure. | |
| Replace cracked or missing weather-stripping. | |
Contact your local NPPD Technical Solutions Consultant for additional information or to identify energy conservation opportunities in greater detail.



