The GGS wells have been prepared for operation for 2008. NPPD anticipates utilizing the well field periodically in the summer of 2008 for cooling discharge temperature mitigation.

GGS Well Field Pumping (For the week ending 9/14/08)
|
Volume | Units | |
| 2008 GGS well field water pumped to-date | 426.09 | acre-feet | |
| Weekly GGS well field water pumped | 0 | acre-feet |


GGS Well Field Resolution