The GGS wells have been prepared for operation for 2009. NPPD anticipates utilizing the well field periodically in the summer of 2009 for cooling discharge temperature mitigation.

GGS Well Field Pumping (For the week ending 9/20/09)
|
Volume | Units | |
| 2009 GGS well field water pumped to-date | 3235 | acre-feet | |
| Weekly GGS well field water pumped | 195 | acre-feet |


GGS Well Field Resolution